Always type the company name. Rapid Compliance will match existing clients on our side.
New client — extra company details
Please complete the company information below.
Step 2
Project Details
Declaration acknowledged for the selected option.
Default is 1 visit per month. You can increase this if needed. The final number of visits will ultimately be determined by the risk on site. It is better to budget for more visits rather than less.
Minimum is 2 visits per month. The final number of visits will ultimately be determined by the risk on site.
It is better to rather budget for 4 visits per month.
Please make sure that you have the correct site name and spelling.
Any mistakes with site / project names that need to be rectified afterwards as a result of
incorrect names provided by the person requesting this form will be billed for.
Official form under the Occupational Health and Safety Act, 1993 (Regulation 4 of the Construction Regulations, 2014).
Complete, sign, and return to Rapid Compliance for submission to the Department of Labour at least 7 days before work starts.
Provide a one-liner that describes your scope of work.
Important: Download the Health & Safety File Requirements document below and
email it to your sub-contractors so they know what documentation they must provide.
Minimum safety file requirements for sub-contractors. Send this document to each sub-contractor listed above.
Optional — you may leave this blank.
If Yes, please list them (e.g. Paint, Silicone, Thinners, Acetone, Diesel, Petrol, Cement, etc.).
Select all that apply under each group (optional — leave blank if none apply). These feed into the Method Statement tools section (G).
Tools that do not use electricity. Select all that apply.
Select all that apply. Optional — you may leave this blank if none apply.
Select all that apply.
e.g. Walking Boards, Lifelines, or note if it is a concrete roof that cannot be fallen through.
e.g. Work Restraint, Self Retracting Lifelines, Physical Barriers on the edges, Warning Tape 1 metre before all edges, or note if the roof has parapet walls high enough to prevent falling from the roof.
Step 3
Method Statement
Complete the method statement using Rapid Compliance’s template structure.
Details already entered on this form have been filled in where possible — please check and complete the rest.